Commercial Rooftop Unit Replacement in St. Louis

Replace commercial rooftop HVAC equipment with the curb, crane, roof, power, gas, controls, condensate, shutdown, startup, and turnover requirements organized before the lift.

Equipment + curb conditions verified
Crane and shutdown planning included
Roof, power, gas + controls coordinated
Commercial rooftop HVAC equipment on a low-slope roof in Greater St Louis.

Qualified project review

Start your commercial RTU replacement review

Commercial projects prioritized. Qualified residential projects accepted. $15k minimum.

Step 1 of 2
Service(s)*

Commercial first

Planned commercial, multifamily, facility, and substantial component projects receive priority.

Interfaces included

Adjacent roofing, HVAC, electrical, plumbing, concrete, and exterior conditions stay visible when they affect the scope.

Written project basis

Verified conditions, assumptions, allowances, exclusions, approvals, schedule logic, and closeout are documented.

The intended outcome

Scope the decision before pricing the work.

A commercial proposal is more useful when it starts with the property, operating outcome, known conditions, and acceptable assumptions—not only a unit price.

Outcome01

Equipment selected for the actual building

Existing nameplate data is a starting point, not a complete design. Building use, operating problems, distribution, ventilation, controls, utilities, envelope changes, and available load information shape the replacement basis.

Outcome02

A lift plan connected to the property

Crane location, delivery route, roof access, parking, overhead conditions, tenant entrances, public protection, unit removal, weather, and lift timing are reviewed before a date is promised.

Outcome03

Every startup dependency assigned

Curbs, roofing, duct transitions, power, disconnects, gas, condensate, controls, fire-alarm interfaces, testing, balancing, startup, and owner training receive named responsibility in the proposal.

Commercial Rooftop Unit Replacement scope

The visible work and the hidden assumptions.

Final inclusions depend on field conditions, available information, required design, the jurisdiction, responsible trade parties, and the approved proposal. These are the elements the review should make explicit.

Scope01

Existing-unit documentation

Unit count, model and serial information, capacity, fuel, voltage and phase, curb dimensions, duct arrangement, controls, outside air, known failures, service history, and accessible site conditions establish the replacement starting point.

Scope02

Replacement basis and capacity

The scope distinguishes verified selection criteria from assumptions about load, occupancy, ventilation, distribution, envelope, internal equipment, and future use. Design or engineering needs are identified rather than hidden inside “like-for-like.”

Scope03

Curb and duct transitions

Existing curb compatibility, adapter needs, supply and return openings, sheet-metal transitions, structural or dimensional constraints, flashing limits, temporary openings, and weather protection are reviewed before procurement.

Scope04

Crane, access, and roof protection

Lift radius, setup area, delivery, parking restrictions, overhead conditions, barricades, roof paths, staging, unit disposal, weather limits, and restoration responsibilities are connected to the property’s operating plan.

Scope05

Utilities and controls

Electrical capacity, feeders, disconnects, gas, venting, condensate, thermostats, sensors, control sequences, economizers, outside air, equipment interfaces, and fire-alarm shutdown requirements are assigned and verified.

Scope06

Startup and turnover

Manufacturer startup, operational checks, control verification, testing and balancing where included, filter and belt information, training, product data, warranty registration, photos, and final records complete the defined replacement.

Before comparing bids

Resolve the decisions that move the number.

These questions influence system selection, allowances, schedule, responsible parties, operational risk, and whether two proposals are actually pricing the same outcome.

Is the project truly like-for-like?

Changes in occupancy, internal loads, ventilation, envelope, distribution, controls, utility capacity, or operating expectations can make a nameplate match incomplete. The responsible basis of selection should be documented.

Will the existing curb work?

Unit footprint, supply and return openings, curb height, roof assembly, adapter geometry, structural conditions, drainage, service clearances, and manufacturer details affect whether a curb can remain.

What must operate during the changeover?

Critical areas, tenant hours, refrigeration, ventilation, process loads, security, IT, and weather conditions influence shutdown windows, temporary measures, phasing, and restart responsibilities.

What controls the procurement date?

Equipment availability, approved selection, submittals, controls, curb or adapter fabrication, electrical gear, utility work, permits, crane access, and seasonal demand may all govern the credible schedule.

Information that improves the review

Bring the property, constraints, and target outcome.

Complete information reduces contingency and exposes dependencies early. Send what is available; missing conditions can be identified before responsible pricing.

  • Property address, building use, operating hours, affected areas, and target outcome
  • Unit schedule, nameplate photos, model and serial data, service records, and controls information
  • Available mechanical plans, load data, test-and-balance reports, and owner requirements
  • Roof, curb, duct, ceiling, equipment-room, crane, delivery, parking, and access conditions
  • Electrical, gas, condensate, ventilation, controls, fire-alarm, and distribution interfaces
  • Budget, procurement deadline, shutdown windows, phasing, startup, and turnover expectations

Connected building systems

Assign the interfaces before construction.

Vulcan remains focused on roofing, HVAC, electrical, plumbing, concrete, and exteriors. Connected work is coordinated only when it is expressly included in the approved project.

HVAC + flat-roof replacement

Unit removal, curbs, temporary openings, flashing, roof protection, membrane sequencing, penetrations, drainage, and warranty responsibilities can be planned together when the roof is also being replaced.

HVAC + electrical capacity

Voltage, phase, minimum circuit ampacity, overcurrent protection, feeders, disconnects, controls, available service capacity, shutdowns, inspection, and energization are checked against the approved equipment.

HVAC + plumbing or concrete interfaces

Gas, condensate, drains, equipment connections, ground-mounted pads, housekeeping slabs, dimensions, elevations, anchorage information, curing, and setting sequence are included only when expressly listed in the project scope.

A clearer commercial proposal

Know what the number includes.

The final proposal—not this page—controls the work. Confirm limits, responsible trade parties, approvals, assumptions, allowances, schedule logic, changes, and turnover before award.

Where a license, permit, design professional, utility approval, test, inspection, or manufacturer review is required, the written scope should identify the responsible party and what is included for the actual address.
01

Existing and proposed units identified by capacity and key requirements

02

Selection basis plus load, ventilation, distribution, and controls assumptions

03

Curb, duct, roof, power, gas, condensate, controls, and fire-alarm responsibilities

04

Crane, delivery, access, protection, shutdown, temporary-condition, and phasing plan

05

Demolition, disposal, restoration, exclusions, allowances, alternates, and changes

06

Startup, testing, balancing where included, training, warranties, and closeout records

One accountable process

From project information to useful closeout.

01

Send the project information

Share the property, current condition, target outcome, available documents, operating constraints, budget, and requested date.

02

Verify fit and missing conditions

The team reviews what is known, identifies what must be field-verified, and confirms whether the substantial planned scope fits Vulcan.

03

Compare the written scope

Limits, inclusions, interfaces, assumptions, allowances, exclusions, schedule logic, and change handling are organized before award.

04

Coordinate through closeout

Approved work moves through access, construction, communication, inspections, punch, photos, and useful turnover records.

Project fit

Commercial priority. Residential considered.

Commercial + multifamily

Vulcan prioritizes planned commercial and multifamily RTU replacements where equipment selection, lifting, roof interfaces, utilities, shutdowns, startup, and documented turnover need one coordinated plan.

Qualified residential

Qualified residential whole-system replacements and substantial planned HVAC upgrades are considered through the broader HVAC service. Emergency no-cool or no-heat dispatch is not the focus.

Review all commercial hvac capabilities

Commercial Rooftop Unit Replacement questions

Scope questions, answered plainly.

Is a commercial rooftop-unit replacement always like-for-like?+

No. Existing nameplate data is useful, but building use, occupancy, ventilation, distribution, envelope, internal loads, controls, utilities, performance problems, and future plans may affect the responsible replacement selection.

Does Vulcan coordinate the crane and permit requirements?+

Crane, delivery, protection, and applicable permit responsibilities can be included in the written project scope. The actual requirements depend on the property, lift plan, jurisdiction, equipment, and responsible trade parties.

Can the existing RTU curb be reused?+

Possibly. Compatibility depends on dimensions, supply and return openings, height, roof assembly, adapter needs, structural conditions, drainage, service clearances, and the approved equipment and manufacturer details.

Who handles electrical, gas, controls, condensate, and roofing connections?+

The proposal should assign each interface to the properly qualified responsible party. When those services are part of the approved Vulcan project, they can be coordinated in one sequence rather than left between separate schedules.

How long will the building be without heating or cooling?+

Downtime depends on unit count, phasing, curb and duct work, utilities, controls, inspections, weather, access, startup, and the needs of occupied areas. A shutdown window should be committed only after those conditions are reviewed.

Does Vulcan provide emergency commercial HVAC repair?+

Vulcan focuses on planned whole-system and rooftop-unit replacement, not emergency dispatch or isolated component repair. Submit the equipment information and target outcome so project fit can be confirmed.

Greater St. Louis · projects reviewed for fit

Start with the building and the outcome.

Send the address, available documents, current condition, target date, and what must stay operational. Vulcan will review the RTU replacement scope and confirm next steps.